STEPS Telecom

Field surveys that turn into client‑ready reports, without the delay.

STEPS carries out tower, GSM/RRU, BTS‑room, and microwave site surveys and installation support for LSPs, vendors, and network operators across Bangladesh — coordinated end to end, from the first site visit to the final bill.

GSM Antenna RRU / Radio BTS Room Equipment Microwave ODU / IDU Tower Structure

How a project runs

The same sequence, every time, so a client always knows where their project stands.

  1. 1

    Scope agreed

    An LSP, vendor, or operator issues a project diagram and engages our team. Scope and billing terms are set by contract.

  2. 2

    Team briefed

    Work is split between the field team and the document team, with a task list and required formats defined before anyone travels to site.

  3. 3

    Field work

    The field team surveys or installs on site, daily, sending photos, notes, and asset data back as the work happens.

  4. 4

    Documentation

    The document team turns that raw material into the client's required Excel and report format — one workbook tab per site.

  5. 5

    Status tracked

    Every site is marked Completed, Revisit Needed, or Blocked, with the reason — access, water, or payment — escalated to the right person.

  6. 6

    Final billing

    Once every site is complete and both teams are reconciled, the client bill is generated against the agreed terms.

What we do on site

Survey and installation work across the equipment a typical mobile site carries, start to finish.

Tower & antenna site survey
GSM and RRU/radio inventory, condition checks, and photo capture against the client's asset register.
BTS room & equipment audit
Indoor equipment identification, serial and asset-tag validation, cross-checked against operator PM records.
Microwave link survey & support
ODU/IDU inspection and installation assistance for microwave backhaul links between sites.
Site documentation & reporting
Raw field data converted into the client's exact Excel submission format — no manual reformatting on their end.
Asset validation & reconciliation
Site-found assets matched against operator databases; newly found or missing items flagged, not guessed at.

Run on our own platform

Every project here runs through TelcoFlow, the coordination system built for our own field and document teams — task assignment by site, status tracking, Excel report generation, and daily progress summaries, so nothing waits on a spreadsheet passed around by hand.

  • Daily task assignment and site-by-site status
  • Excel reports generated in the client's own format
  • Daily WhatsApp / Telegram progress summaries
  • Billing and payment reconciliation per project
Open team login

About STEPS

STEPS — Smart Telecommunication Engineering & Power Solutions is based in Abhoynagar, Jashore, and works directly with field teams across Bangladesh's network operators, LSPs, and vendors.

Site and client data stay confidential — visible only to the people assigned to that project, tracked the same way from the first site visit to the final report.

GSM · RRU · BTS · MWEquipment surveyed on every site type
Field + DocumentTwo teams, one project record

Get in touch

For survey, installation, or documentation work — reach us directly.

Address
Akterpur, Taltalahat‑7461, Abhoynagar, Jashore, Bangladesh

Already working with us? Sign in to TelcoFlow to submit site data or check today's task list.